When paving needs laying or relaying
- Slabs have sunk or rock underfoot
- Slabs along the path have cracked
- Puddles sit on the patio after rain
- The front garden is to become a parking space
- A sloping garden needs steps
- You want a patio outside the back door
A base that keeps paving level
How long paving stays level depends on what is underneath. Slabs laid on a thin bed of sand over soft soil sink and rock within a few winters, so a sub-base of compacted crushed stone goes down first, dug deeper on clay soils or where vehicles will cross.
A patio is laid with a slight fall away from the house so rain runs off, and kept below the damp-proof course of the walls. Edges are set firmly so the outer slabs do not spread.
Get a quoteWhat paving work covers
New patios laid with a slight fall away from the house.
Paths and edging laid to take regular foot traffic.
Permeable paving, gravel or surfaces drained to a planted area at the front of a house.
Steps with even risers built into sloping ground.
Sunken or loose slabs lifted and relaid on a new base.
Joints filled with mortar or jointing compound to finish.
How a patio is laid
- Digging out
The area is dug to a depth that suits the soil and how the paving will be used.
- Laying the sub-base
Crushed stone is laid and compacted to give a firm, level base.
- Bedding and jointing
Slabs are bedded with a fall away from the house, then the joints are filled with mortar or jointing compound.
What the price depends on
- The size in square metres
- The slabs, blocks or gravel you choose
- What is there now: lawn, old slabs or concrete
- The depth of base the soil and use need
- Slopes, steps and edging
Front gardens and rainwater in Wales
The Welsh Government's guidance on patios and driveways sets a rule for the front of a house. A hard surface laid or replaced there must be permeable or porous, or the rainwater from an impermeable surface such as concrete must be directed to a permeable area at the front of the home. Repairs of up to 5 square metres to an existing surface can use ordinary materials.
Permeable choices include permeable block paving with grit-filled joints, gravel held in a grid, and slabs laid to fall towards a planted bed or lawn.
A planning application is needed for a listed building, where significant embanking or terracing is involved, or where the council has removed permitted development rights. These allowances apply to houses, so owners of flats and maisonettes should check with the council.
Areas we cover
We cover South and West Wales, from Pembrokeshire to Newport.
Questions about paving
How much does a new patio cost?
It depends on the size, the slabs or blocks you choose, what has to come up first and the depth of base the ground needs.
Can I pave over my front garden in Wales?
For a house, usually without a planning application, as long as the surface is permeable or the rainwater drains to a permeable area at the front. Listed buildings, and properties with permitted development rights removed, need permission.
Why has my patio sunk?
The usual cause is a weak base: too little crushed stone, poor compaction or soil that has settled. Relaying on a new base deals with it.
I want to park on my front garden. What else do I need?
Crossing the pavement to reach it needs a dropped kerb, which requires approval from the council. Check with the council before the parking area is laid.
Can old slabs be reused when paving is relaid?
Sound slabs are often reused once the base has been rebuilt. Cracked ones are replaced, and matching them depends on the same slab still being made.
Send your paving plans
Tell us whether it is a patio, a path or a front garden, the rough size in square metres and the material you prefer. Say what is there now, such as lawn, old slabs or concrete, and send photos that show any slope and where rainwater runs.
This service is carried out by Limeworks Outdoor Services, a Dragon Multi-Trade brand.