When to book groundworks support
- A plot to clear before the build starts
- Foundations to dig to the engineer's drawings
- Drainage or service trenches to run out to the road
- Ground to level for a slab, drive or car park
- Topsoil to strip and stockpile for landscaping later
How operated plant handles the groundworks
The machines do the digging and earthmoving, and your team keeps control of the design, setting-out and inspections. Mistakes at this stage are expensive to correct, so the operator works to the drawings and levels your site lead gives.
If the dig hits unexpected ground or water, the operator stops and tells your site lead. You then decide the next step with your engineer, such as digging deeper, pumping out or changing the foundation design.
Get a quoteGroundworks stages covered
Vegetation, old hardstanding and rubble cleared with operated plant.
Topsoil stripped and stockpiled on site for reuse.
Trenches dug to the line, depth and fall on your drawings.
Strip and trench-fill foundations dug to the dimensions set by the engineer or drawings.
Ground brought to the levels set out for slabs, drives and patios.
Excavated material loaded into dumpers, skips or muck-away lorries.
How a groundworks job is set up
- Locate the services
Get utility plans, scan with a cable locator and mark what is found before any digging.
- Set out the work
Mark the lines, levels and depths on site from the drawings.
- Dig and load
The operator excavates to the marks and loads spoil for removal or reuse.
What the price depends on
- The stages of work and the volume of material
- The machines the job needs, such as an excavator and a dumper
- How long each stage of the work runs
- How spoil will leave the site
- The ground conditions
Find underground services before digging
The HSE guidance Avoiding danger from underground services (HSG47) sets out a safe system of work in three parts: planning the work, locating and identifying services, and safe excavation. Plans show approximate positions only, so scan and hand dig trial holes near the dig. As hirer you hold this information and direct the operator.
Nesting birds on cleared ground
Active wild bird nests are protected by law, so check scrub, hedges and trees before clearing, particularly in spring and summer.
Building control inspections
If the work needs building regulations approval, ask your building control body when it wants to see the excavations, and plan the concrete pour around that visit.
Spoil leaving site
Excavated material taken off site is normally treated as waste and must go with a registered waste carrier to a permitted site.
Areas we cover
We cover South and West Wales, from Pembrokeshire to Newport. Local pages: groundworks support in Swansea and groundworks support in Llanelli.
Questions about groundworks support
How much does groundworks support cost?
It depends on the stages you need, the volume of material, the machines involved, the number of days and how spoil will leave the site.
Who finds the underground services before digging?
The hirer arranges utility plans, scanning and trial holes, as set out in HSE guidance HSG47. Share the plans and markings with us before the start date so the operator knows where services run.
Can you dig foundations to an engineer's design?
Yes. Send the drawings with the widths and depths. The operator digs to those dimensions, and the engineer or building control inspector checks the depth and bearing ground.
Can the operator dig drainage to a fall?
Yes. Give the depths at each end or the invert levels from the drawings, with the trench width and bedding, and check the levels as the trench goes in.
Send the groundworks details
Share the drawings or a sketch, the site address, the stages you need help with, the utility plans and survey markings you hold, how spoil will leave site, and the dates.