When the job needs a larger excavator
- A plot to strip, clear or reduce in level
- Drainage runs and sewer connections deeper than a mini digger reaches
- Old foundations, rubble or hardstanding to break out and load
- Muck-away lorries waiting to be loaded
- Banks, ditches or a temporary haul road to form
How the excavation is carried out
Larger tracked excavators move material faster than a mini digger and reach deeper. The operator works to your drawings, levels and setting-out, and loads lorries or dumpers as the dig proceeds.
These machines need more room to get in and to work. The gate width, weight limits on the route, the ground and the reach the work needs decide which machine suits the site.
Get a quoteWhat the excavator is used for
Digging out large volumes for reduced levels, basements and building plots.
Drainage and service trenches dug to the depths and falls on your drawings.
Removing vegetation, rubble and old foundations ahead of a build.
Loading muck-away lorries or dumpers as the dig proceeds.
Shaping banks, ditches and temporary haul roads to your levels.
How an excavator hire is planned
- Send the drawings
Share drawings or a description of the excavation, with the depths and volumes.
- Check the route and ground
Describe the road to site, where a lorry can unload and whether the machine will sit on firm ground or a slope.
- Dig to the setting-out
The operator digs to the levels marked on site or given by your site lead.
What the price depends on
- The machine size the access, depth and reach call for
- The length of the hire
- Transport of the machine to and from the site
- The volume and depth of the excavation
- Any lifting planned, which needs its own planning
Trench sides can collapse
The sides of a trench or excavation can collapse without warning. HSE guidance is to shore the sides or batter them back to a safe angle, keep spoil, materials and machines back from the edge, and fit barriers where people or vehicles could fall in. Planning this is part of the hirer's site responsibilities.
Lifting with an excavator
Say in the enquiry if anything will be lifted, such as pipes, manhole rings or kerbs. HSE treats lifting with an excavator as a lifting operation under the Lifting Operations and Lifting Equipment Regulations 1998 (LOLER), which has to be planned by a competent person, and notes that an excavator is often not the most suitable machine for a lift.
Areas we cover
We cover South and West Wales, from Pembrokeshire to Newport. Local pages: excavator with operator in Swansea, excavator with operator in Carmarthen and excavator with operator in Cardiff.
Questions about excavator with operator
How much does excavator hire with an operator cost?
It depends on the size of machine the job needs, the number of days, the transport to site and the volume and depth of the dig.
What size of excavator do I need?
That depends on access, depth, reach and how much material is moving. Send drawings or a description of the excavation, the access width and the ground conditions with the enquiry.
Who provides trench support?
Support or battering of excavations is part of the hirer's site planning. Tell us the depths, the ground and how the sides will be supported, so the operator can work to that plan.
Can the operator work to levels on our drawings?
Yes, provided the setting-out and levels are marked on site or given to the operator by your site lead. Setting out is the hirer's responsibility unless agreed otherwise.
What should I tell you about the route to site?
Mention weight limits, low bridges, narrow lanes or soft verges on the route, and where a delivery lorry can stop and unload.
What we need to quote an excavator with operator
Send drawings or a description of the excavation, the depths and volumes, the route to site for a delivery vehicle, the ground conditions, any lifting planned and the dates.
This service is carried out by Copperworks Plant Hire, a Dragon Multi-Trade brand.